8 Communal podium garden for non-residential buildings 非住??宇的公用平台花园 9% 3.4 Features Promoting High Buildability 达致高可建性的相关设施 3.4.1 Prefabrication Element 预制组件 (Thickness accountable for GFA concession = 150mm) (可获总楼面面积宽免的厚度 = 150mm) Domestic Projects 住用项目 Features Subject to Overall Cap of 10% 限於 10%整体上限限制的设施

11 Non-structural prefabricated external wall 非结构预制外墙 45% Non-Domestic Projects 非住用项目 Non-Capped Features 不限於 10%整体上限限制的设施

11 Non-structural prefabricated external wall 非结构预制外墙 0% Remarks 备注: Features with relative high application rate 较高应用率的设施 Features with relative low application rate 较低应用率的设施

8 3.4.2 Modular Integrated Construction (MiC) 「组装合成」建筑法 PNAP ADV-36 作业备考 ADV-36 3.4.3 Curtain Wall 幕墙 PNAP APP-2 作业备考 APP-2 Thickness not accountable for GFA = 200mm (Domestic Projects) or 250mm (Non-Domestic Projects) 无须计算总楼面面积内的厚度= 200mm (住用项目) 或250mm (非住用项目) Initiative from Housing Authority 房委会的倡议 In 2008, the [Housing Authority] began to adopt modular flat design to optimise site potential under the principle of '

functional and cost-effective'

design. The volume of precast concrete of the public housing developments with the basic PCCs was about

20 per cent then, which would be increased to

35 per cent if volumetric precast bathrooms were adopted. Housing Authority increases use of precast concrete components and mechanised construction , Press Releases from Hong Kong SAR Government,

15 September, 2018. 「在『实而不华』的设计方针下,房委会於二八年开始采用构件式单位设计, 藉以尽量提高地盘发展潜力.在公营房屋发展项目中,基本预制组件使用的预制混 凝土占总混凝土用量约20% ;

若再加上『立体预制浴室』,使用率更增至35%.」 「房委会更广泛使用预制组件及机械化建筑法」, 香港特别行政区政府新闻公报,2018 年9月15 日93.5 Study of the Existing Application of BEAM Plus as prerequisite for obtaining GFA concession 现行使用绿建环评为总楼面面积宽免的先决条件的研究 Information from BEAM Society (based on completed projects during 2014-2016) 资料来源自建筑环保评估协会 (基於

2014 至2016 年间完成的项目) *Remark: Under BEAM Plus New Buildings V1.2, Unclassified means the Applicant has not met the minimum requirements in achieving any rating as set out in the BEAM Plus Manual 备注:於绿建环评 新建建筑 1.2 版 ,不予评级是指申请人未达至绿建环评工具手册中所规定的评级 的最低要求. Certified (Final Assessment Achieved) 获得认证 71% Ongoing (exceed

18 months) 认证进行中 (超过18 个月) 29% Distribution of BEAM Plus New Buildings V1.2 Final Assessment Result for Projects (obtained OP) participated in PNAP-APP

151 通过PNAP-APP 151获得总楼面面积宽免项目(已获占用许可证)的 绿建环评 新建建筑 1.2版 最终评估结果分布 11% 19% 12% 18% 40% 12% 19% 5% 25% 39% 0% 10% 20% 30% 40% 50% Platinum 铂金级 Gold 金级 Silver 银级 Bronze 铜级 Unclassified* 不予评级* BEAM Plus New Buildings V1.2 Provisional Assessment vs Final Assessment Result 绿建环评 新建建筑 1.2版 初步评估及最终评估的结果对比 Provisional Assessment (PA) 初步评估 Final Assessment (FA) 最终评估