"2019年4月南平市发改委固定资产投资项目审批、核准、备案情况参考表" "项目序号","建设单位名称","建设项目名称","建设地址","行业分类","建设单位法人","主要建设内容","计划总投资(万元)","项目审批、核准和备案情况",,

,,

"项目联系人姓名","备注" 形式","单位","文号","时间",,

"审批核准类" "1","邵武市富益发电有限公司","关于邵武市拿口水电站增效扩容改造项目核准的批复","邵武市拿口镇焦坑村拿口水电站",,

,"本次增效扩容改造,改造右岸水轮发电机组4台、水轮机型号为ZDJ6+15-LWY-170,改造左岸水轮发电机组5台、水轮机型号为ZDJ6+20-LWY-130.

两岸现状总装机容量为3250kw(2000kw+1250kw),改造后两岸总装机容量为4000kw(2400kw+1600kw).","1069.91","核准","南平市发展和委员会","南发改审批〔2019〕17号","43559","郑琼晖", "2","南平市浦南高速公路南平城区连接线开发建设有限公司","关于变更大家厂片区莲花山路至滨江东路连接线改造提升项目业主的批复",,

,,

,,

"项目建议书","南平市发展和委员会","南发改审批〔2019〕18号","43564","李卫平","其余内容仍按照(南发改审批〔2018〕20号)文执行" "3","南平市城市公园管理处","关于九峰山道路(九峰山公园至316国道连接线)项目可行性研究报告的批复","南平市延平区水南东坑村东岭片区",,

,"项目起于南平市东坑316国道亿发商贸城西侧,终于九峰山公园零公里处.道路全长约1580米,其中新建路段1200m,九路改造段380m,道路红线宽度为5m.项目新建前段200m为城市支次干路,设计车速30km/h,新建后段950m为城市支路,设计车速20km/h.项目用地总面积7.0999公顷.","6479.625","可行性研究报告","南平市发展和委员会","南发改审批〔2019〕19号","43572","余俊", "4","南平工业园区开发建设有限公司","关于南平市316国道改扩建B标污水管网工程可行性研究报告的批复","316国道文田高速路口至超限站",,

,"建设DN300污水压力管410米、DN400污水压力管780米、DN300污水重力管1100米.","428.2803125","可行性研究报告","南平市发展和委员会","南发改审批〔2019〕20号","43578","黄兆兴", "5","国网福建省电力有限公司南平供电公司","关于南平松溪岩下110千伏变电站2号主变扩建工程电网项目核准的批复","松溪县",,

,"扩建110千伏变压器1台,主变容量50兆伏安;

建设相应通信和系统二次工程.","994","核准","南平市发展和委员会","南发改审批〔2019〕21号","43580","王亚同", "6","国网福建省电力有限公司南平供电公司","关于南平光泽寨里110千伏变电站2号主变扩建工程电网项目核准的批复","光泽县",,

,"扩建110千伏变压器1台,主变容量50兆伏安;

建设相应通信和系统二次工程.","1005","核准","南平市发展和委员会","南发改审批〔2019〕22号","43580","王亚同", "7","国网福建省电力有限公司南平供电公司","关于南平浦城梦笔110千伏变电站2号主变扩建工程电网项目核准的批复","浦城县",,

,"扩建110千伏变压器1台,主变容量31.5兆伏安;

建设相应通信和系统二次工程.","814","核准","南平市发展和委员会","南发改审批〔2019〕23号","43580","王亚同", "8","国网福建省电力有限公司南平供电公司","南平建瓯南雅110千伏变电站2号主变扩建工程电网项目核准的批复","建瓯市",,

,"扩建110千伏变压器1台,主变容量50兆伏安;

建设相应通信和系统二次工程.","953","核准","南平市发展和委员会","南发改审批〔2019〕24号","43581","王亚同", "备案类" ,"无" "招标类" ,"无" "节能类" ,"无" ,,

,,