考虑线路可变损耗和收益风险的峰谷分时电价模型对电网规划的影响 周步祥1,刘舒畅1,董申1,张冰2,王耀雷3 (1.

四川大学 电气信息学院,成都 610065;

2. 四川省电力设计咨询有限责任公司,成都 610065;

3. 国网山东省电力公司经济技术研究院,济南 250000) 摘要:近些年随着峰谷分时电价在多个省份的实施,改变了原有的用户负荷特性,使峰、谷负荷差值逐渐缩小,对电网规划中的负荷预测产生了影响.因此,本文从峰谷分时电价对电网规划的影响出发,分析了峰谷分时电价对电网规划的影响,制定了考虑该影响的规划方案.其次,对峰谷分时电价模型进行优化,分析了线路可变损耗和收益风险对峰谷分时电价的影响,得到了负荷方差越小,线路可变损耗和收益风险越小的结论.优化后的模型考虑了线路可变损耗和收益风险对电网规划经济性和适用性的影响,对电网规划中的变电站容量规划和投资进行修正优化,使得电网规划中的容量规划和投资更加经济,合理.同时得到了最大负荷转移率是联系峰谷分时电价和电网规划的桥梁,传递着峰谷分时电价对电网规划的影响这一结论.最后,通过仿真分析,量化了峰谷分时电价对电网规划的影响程度,验证了本文采用的优化模型具有更好的适用性和准确性. 关键词:峰谷分时电价;

可变损耗;

负荷方差特性;

收益风险;

容量规划 中图分类号:TM933 文献标识码:B 文章编号:1001-1390(2019)00-0000-00 Impact of peak-valley tou TOU price model considering line variable loss and revenue risk on power grid planning Zhou Buxiang1, Liu Shuchang1, Dong Shen1, Zhang Bing2, Wang Yaolei3 ((1.School of Electrical and Information, Sichuan University, Chengdu 610065, China. 2. Sichuan electric Electric power Power design Design consulting Consulting coCo. ., LTD,td., Chengdu 610065,,

China. 33. economic Economic and Technical Research Institute,,

State Grid Shandong Electric Power Company,,

Ji'

nanJinan 250000,,

China)) Abstract: In recent years, with the implementation of the TOU electricity in several provinces, the original user load characteristics have been changed, the peak and valley load differences have been gradually reduced, and the load forecasting in power grid planning has been affected. Therefore, starting from the impact of TOU pricing on grid planning, this paper analyzes the impact of TOU pricing on grid planning and formulates a planning scheme that takes this into account. Secondly, this paper optimizes the TOU price model, analyzes the influence of variable line loss and return risk on the TOU price, and obtains the conclusion that the smaller the load variance is, the less the line variable loss and the return risk are. The optimized model considers the influence of line variable loss and return revenue risk on the economics and applicability of grid planning. The capacity planning and investment in grid planning are modified and optimized to make capacity planning and investment in grid planning more economical, reasonable. At the same timeMeanwhile, it is concluded that the maximum load transfer rate is a bridge connecting the TOU electricity price and the power grid planning, and transmitting the impact of TOU price on the power grid planning. Finally, the simulation analysis proves the correctness of the theoretical analysis and quantifies the impact of peak-valley time-of-use price on power grid planning. It proves that the optimization model adopted in this paper has better applicability and accuracy. Key words: peak-valley time of use power electricity price, variable loss, load variance characteristics, revenue risk, capacity planning

下载(注:源文件不在本站服务器,都将跳转到源网站下载)
备用下载
发帖评论
相关话题
发布一个新话题